<< back to search results

Transmitter plant - The Gates MW50 floor plan - 1981

WGTO's chief engineer Frank Berry re-designed the transmitter plant's floor plan in 1981 after a 10kw
transmitter had gone up in flames. The work included moving the night phasor and installing a new 1kw night
transmitter and another equipment rack.  He also built a new workbench, added a wall and doorway to
access the rear of the night system, and installed new carpeting and soundproofing.  (courtesy Frank Berry)

Home | WPLA | WONN | WLAK | Other Stations | Related Links | Contact Us

© 2022 RadioYears.com All rights reserved.
Built by fusionZONE, Inc.